Search This Blog

Showing posts with label erosion control. Show all posts
Showing posts with label erosion control. Show all posts

Friday, April 3, 2015

Urban Stream 054

Gabions protection stream bank at bend.  Lenexa, KS.  Sony Cyber-shot.  March 30, 2015.



Urban Stream 052

Geocell cellular confinement system for stabilization of urban stream bank.  Lenexa, KS.  Sony Cyber-shot.  March 30, 2015.



Urban Stream 050

Gabions for stream bank stabilization.  Lenexa, KS.  Sony Cyber-shot.  March 30, 2015.



Urban Stream 049

Stream bank protected from erosion by gabions.  Lenexa, KS.  Sony Cyber-shot.  March 30, 2015.